Case Study: Commercial Kitchen Ventilation System

A Comprehenisve Ventilation Solution for Carmel Clay

Discover how Z-Ventilation Solutions transforms commercial kitchens with our industry-leading ventilation systems.

Site Survey

Evaluate and measure your building with detailed dimensions ensuring no surprises prior to engineering your system.

Design & Engineering

Tailored ventilation systems designed to meet the unique requirements of your kitchen.

Package Quote & Expert Installation

Our team ensures seamless integration and installation of entire ventilation system.

Final Startup & Testing

Factory Certified Technician will inspect the installation of the hood system

About Z-Ventilation Solutions

Z-Ventilation Solutions (ZVS) is a leader in providing turnkey, customized solutions for commercial kitchen ventilation systems. Our expertise spans across restaurants, hospitals, and institutional cafeterias. What sets us apart is our comprehensive approach, combining design, engineering, sales, and installation to deliver unparalleled service. Our mission is to offer End-to-End Solutions that ensure optimal performance, safety, and compliance for every project.

3D ventilation drawing my z-ventilation

Carmel Clay High School Project

Education Facility

Client

Carmel Clay High School

Date

August 2024

Ventilation Package

+ 2 Hoods (12 feet)
+ Auto Start Controls
+ Field Fabricated Supply & Exhaust Duct
+ Pre-engineered Fire Suppression Installation and local AHJ Testing

What's in the Ventilation Package?

Centrifugal Downblast Exhaust Fan – Direct Drive

Modular Packaged Unit

When Carmel Clay High School required an upgrade to its kitchen ventilation systems, they chose Z-Ventilation Solutions for our expertise and comprehensive approach. The project involved installing two 12-foot hoods to manage the high-demand environment of a school kitchen. Our end-to-end solution covered everything from design to installation, including utility and efficiency upgrades, advanced installation techniques, and ensuring connectivity and control. We overcame challenges like curb design modifications and shipping issues, demonstrating our commitment to delivering customized top-of-the-line hood packages and professional engineering guidance.

Challenges and Solutions

Overcoming Installation Challenges

During the installation, our team faced a few unexpected challenges that tested our adaptability and technical skills. One significant issue was the design of the curbs, which did not initially fit the site’s roof due to unforeseen obstacles. Our installer quickly identified the problem and supplied sketches for a Request for Information (RFI) to be submitted and approved. Not only did we propose the modifications, but we also re-located the curbs once the changes were approved, demonstrating our commitment to providing total project accountability.

Another challenge arose when we discovered that the hoods were not shipped in smaller, more manageable sections as expected. To address this, our installation team and the general contractor (GC) worked meticulously to lift the hoods through a building opening, ensuring they were installed without compromising the integrity of the kitchen structure.

Moreover, some stainless panels were damaged during shipping. Our proactive installer reported the issue and replaced the panels, ensuring that the aesthetics matched the high standards of our installations. The protective plastic left on the panels will ensure they remain pristine until the cooking equipment is fully installed beneath the hoods.

Key Installation Features

Our project at Carmel Clay High School showcased several key elements that highlight our expertise and commitment to quality. From utility upgrades to advanced installation techniques, we ensured every aspect of the kitchen ventilation system was optimized for performance and safety.

Z

Utility and Efficiency Upgrades

We installed a Wall Mounted Utility Cabinet, enhancing both functionality and accessibility for the kitchen staff, ensuring a more efficient workflow.

Z

Advanced Installation Techniques

Our team used crane-lifted roof curbs to support the ventilation systems infrastructure. We also adapted the curb location on-site to optimize the design without requiring a complete redesign.

Z

Safety and Compliance

Custom-fabricated exhaust ducts with double-layer fire wrap were installed for increased safety. We coordinated with local authorities to ensure full compliance with all safety regulations.

Optimize Your Commercial Kitchen Ventilation

Ready to enhance the efficiency and safety of your commercial kitchen? Reach out to Z-Ventilation Solutions for an end-to-end solution tailored to your needs. Our team of industry-established ventilation experts is here to provide you with professional engineering guidance and customized top-of-the-line hood packages. Contact us now to learn how we can help you achieve optimal performance and compliance with our comprehensive solutions.